PRECISION DRILLING & GUNDRILLING
Double Head Drilling Unit
Field-Proven Customer Success & Verified Financial ROI Case Study
Customer Installation Details
Flange & Structural Component Fabricator
📍 Plant Location: Faridabad Industrial Area, NCR Delhi
PAYBACK PERIOD
4.1 Months
ANNUAL SAVINGS
₹12.3 Lakhs / yr
PLC PLATFORM
Siemens
FIELD STATUS
100% Operational
❌ COMPETITOR CHALLENGE & PITFALLS
Sequential single-spindle drilling created a severe bottleneck in the structural flange production line, requiring 2 operators.
PROBITERS ENGINEERING SOLUTION
Probiters Opposed Dual-Spindle Multi-Drilling Head with adjustable center pitch, hydraulic rapid advance, and safety curtains.
✓ VERIFIED METRIC OUTCOME
PRODUCTION LINE THROUGHPUT: +280% Output Increase (1 Operator)
"We doubled our flange drilling output while reallocating one operator to assembly. Cycle time is under 12 seconds per part."
