Probiters Exim LLP
OFFICIAL TECHNICAL DOSSIER ISO 9001:2015 CERTIFIED | AHMEDABAD, INDIA
PRECISION DRILLING & GUNDRILLING

Gundrilling Machine — Centre Hole

Twin-Spindle Concentric Centre-Hole Gundrilling Machine for Axles

EXECUTIVE TECHNICAL DOSSIER & DATASHEET ISO 9001:2015 CERTIFIED DESIGN BASIS v5.0
Executive Value Proposition

Commercial & Operational Highlights

Twin-Spindle Concentric Centre-Hole Gundrilling Machine for Axles

PAYBACK PERIOD 4.6 Months
ANNUAL SAVINGS ₹13.6 Lakhs / yr
PLC AUTOMATION Siemens
LEAD TIME 4–6 Weeks
Proven Field Performance

Customer Success & Verified Financial ROI

❌ COMPETITOR PITFALLS

Single-ended center hole drilling created concentricity misalignment between opposing shaft ends, causing grinding rejections.

PROBITERS ADVANTAGE

Probiters Dual Pneumatic Self-Centering Vise System with synchronized twin opposing gundrilling heads and precision linear guides.

✓ FINANCIAL OUTCOME
CENTER HOLE ALIGNMENT ERROR:
0.4mm Misalignment Down to 0.025mm
"Synchronized twin-head drilling solved our camshaft concentricity issue instantly. Downstream grinding scrap dropped to zero overnight."
Machine Intelligence

Complete Parameter Matrix Table

Engineering FieldVerified Specification / Design Basis
Concentricity Runout0.025 mm TIR opposing center hole alignment
Spindle Head CountDual opposing head simultaneous drilling
Clamping VisePneumatic self-centering dual V-block vise
Production Takt22 seconds per double-ended shaft
Coolant UnitIntegrated oil-mist extractor & high pressure pump
CAD Blueprint Architecture

General Arrangement Vector CAD Drawing

PROBITERS EXIM LLP // GENERAL ARRANGEMENT (GA) SCHEMATIC GUNDRILLING — CENTRE HOLE PROBITERS EXIM LLP — INDIA DWG NO: GA-CAD-2026-CH09 SCALE: 1:15 CAD SHEET: 01 / 01 STATUS: APPROVED FOR CONCEPT ENGR: R&D DEPT DESIGN BASIS & ENVELOPE DIMENSIONS BED LENGTH: 3000 mm EXTRUSION SCREW CAPACITY DRILL RANGE: ⌀ 6 mm – 34 mm COOLANT PRESSURE: 100 BAR HIGH-PRESSURE OIL 3000 mm BAR STOCK BED
Operating Sequence

Visual Process Workflow Stepper

01PART LOADINGPosition component onto application-specific fixture
02POKA-YOKE VERIFYSensors validate orientation and clamp closure
03PLC EXECUTIONServo/hydraulic motion profile executes test sequence
04LOG & RELEASETelemetry logs OK/NOK result and releases part

Need a customized proposal or 3D layout simulation? Our engineering team prepares custom SPM quotes within 3–5 working days.

Request Machine Proposal →